You are the president of Silver Fiddle Construction (SFC), which specializes in

Responsive Centered Red Button

Need Help with this Question or something similar to this? We got you! Just fill out the order form (follow the link below), and your paper will be assigned to an expert to help you ASAP.

You are the president of Silver Fiddle Construction (SFC), which specializes in building high-quality, customized homes in the Grand Junction, Colorado, area. You have just been hired by the Czopeks to build their dream home. You operate as a general contractor and employ only a part-time bookkeeper. You subcontract work to local trade professionals. Housing construction in Grand Junction is booming, and you are tentatively scheduled to complete 11 houses this year. You have promised the Czopeks that the final costs will range from $450,000 to $500,000 and that it will take five months to complete the house once groundbreaking has begun. The Czopeks are willing to have the project delayed in order to save costs.
You have just finished a preliminary scope statement for the project (see below). You are now brainstorming potential risks associated with the project.
Identify potential risks associated with this project. Try to come up with at least five different risks.2. Use a risk assessment form similar to the example in Figure 1 below to analyze identified risks.3. Develop a risk response matrix similar to the example in Figure 2 below to outline how you would deal with each of these risks.
PROJECT SCOPE STATEMENT
PROJECT OBJECTIVE
Construct a high-quality, custom home within five months at a cost not to exceed $500,000.
DELIVERABLES
A 2,500-square-foot, 2½-bath, 3-bedroom, finished home
A finished garage, insulated and sheet-rocked
Kitchen appliances to include range, oven, microwave, and dishwasher
High-efficiency gas furnace with a programmable thermostat
MILESTONES
Permits approved July 5
Foundation poured July 12
“Dry in” (including framing, sheathing, plumbing, electrical, and mechanical inspections) passed September 25
Final inspection November 7
TECHNICAL REQUIREMENTS
Home must meet local building codes.
All windows and doors must pass NFRC class 40 energy ratings.
Exterior wall insulation must meet an “R” factor of 21.
Ceiling insulation must meet an “R” factor of 38.
Floor insulation must meet an “R” factor of 25.
Garage will accommodate two cars and one 28-foot-long Winnebago.
Structure must pass seismic stability codes.
LIMITS AND EXCLUSIONS
The home will be built to the specifications and design of the original blueprints provided by the customer.
Owner is responsible for landscaping.
Refrigerator is not included among kitchen appliances.
Air conditioning is not included, but the house is prewired for it.
SFC reserves the right to contract out services.
CUSTOMER REVIEW
“Bolo” and Izabella Czopek
Figure. 1 & 2 Pic is attached
Be sure to properly organize your writing and include a cover page, an introduction, headings/subheadings for the body of your work, analysis, and recommendations, a conclusion, an appendix, and a list of references.
Your paper should be 3-4-pages (900-1200 words) in length (not including the title and references pages) and conform to the APA 7th edition format. Include at least three scholarly references in addition to the course textbook.
Refer to the Critical Thinking Assignment grading rubric below for more information on assignment expectations and grading.
Reference
Larson, E. W. Gray, C. F. (2018). Case Study 7.2. In Project management the managerial process (5th ed., pp. 255-256). McGraw-Hill Education.

How to create Testimonial Carousel using Bootstrap5

Clients' Reviews about Our Services