ENGG1100: Engineering Design- Project Management- Report Writing Assignment

Responsive Centered Red Button

Need Help with this Question or something similar to this? We got you! Just fill out the order form (follow the link below), and your paper will be assigned to an expert to help you ASAP.

Added on: 0000-00-00 00:00:00Order Code: Question Task Id: 0

Internal Code: TV131
Report Writing Assignment:

Task:

i) Overview
The Milestone assessment is designed to ensure that your team is on track to participate in Demo Day. As the successful completion of Project A requires different disciplinary inputs, the Milestone will check your team’s progress with respect to your:
1) prototype;
2) electrical circuit;
3) software code;
4) design drawings; and
5) manufactured component (Arduino mounting plate).
Marks will be awarded on the basis of 1) above and your Peer Assessment Factor (PAF) will be applied to this mark to obtain your individual mark. Parts 2), 3), 4) and 5) will be Pass/Fail and should your team not achieve a passing grade, you will be given a week to resubmit. There is no re-take for Part 1).

ii) Prototype assessment (5%) Teams will have up to 10 minutes to demonstrate or verify (through the provision of results of experiments, or any other supporting information) all the milestones detailed in Table 7.

Uploaded By : jack
Posted on : February 08th, 2018
Downloads : 0

How to create Testimonial Carousel using Bootstrap5

Clients' Reviews about Our Services