DAT600: Sorting Algorithms and Running Times – Find-Max-Subarray – Engineering Assignment Help

Responsive Centered Red Button

Need Help with this Question or something similar to this? We got you! Just fill out the order form (follow the link below), and your paper will be assigned to an expert to help you ASAP.

Internal Code: 3IIA
Engineering Assignment Help
Task: 1
Running Times
For a given problem with input size
n
, algorithms A, B, C are executed. In terms of
running time, one of the algorithms is O(
n
), another is O(
n
log
n
) and the third is O(
n
2
). Some measured running times of these algorithms are given below:

Engineering

Identify which algorithm has which big-Oh running time and explain your answer.

1.2)
Calculate big-Oh running time, in terms of
n
, of the algorithm D shown below:
Algorithm D (n) {
s = 0; for i = 1 to n -1,
for j = n downto 1 in steps j = j / 2,
s = s + i*j; return s; }

Task: 2

Algorithm Design

Let
E
= {
e
1
,
e
2
, …, e
n
} be a sequence of integers. We say that an integer
x
forms a majority in
E
if
x
appears more than floor(
n
/2) times in
E
. For instance, the integer 3 is a majority in sequence
E
= {2, 3, 3, 2, 3, 3}, whereas the sequence
E
= {6, 3, 2, 7, 3, 1} has no majority.
Assume that for each
i
, we have 1 ?
e
i
?
k
, where
k
is an integer. Describe an algorithm, with O(
n + k
) running time, which decides if
E
has a majority.

Task: 3

Master Theorem

Using the Master theorem, find the running time (Big-O) of the following algorithms:
3.1) Merge sort is a classical recursive divide-and-conquer algorithm for sorting an array. The algorithm splits the array in half, recursively sorts the two halves, and then merges the two sorted sub-arrays into the final sorted array. Time taken for the algorithm can be denoted as:

Engineering

3.2) Time taken for the Karatsuba’s multiplication algorithm is given by the following
recurrence equation:

Engineering

Task: 4

Understanding how “Find-Max-Subarray” and “Quicksort” works

4.1) Show step-by-step, how the procedure “find-max-subarray” determines the
maximum subarray of the following row of numbers: A = [10 -2 8 -7 13 23 -18 14 24 8 -10 8]
4.2) Show step-by-step, how quicksort sorts the following row of numbers:
A = [10 2 8 7 13 23 18 14 24 8]
This DAT600: Engineering Assignment has been solved by our Engineering experts at TVAssignmentHelp. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
 

How to create Testimonial Carousel using Bootstrap5

Clients' Reviews about Our Services