Low Rise Construction Case Study Assessment Answer

Assignment Task: The floor plan above is an extension of an existing building.  This building has a Ground Floor, Level 1 and Roof. The selected suspended floor type (Level 1) is a 150 mm thick ‘in-situ’ reinforced concrete slab.  As shown in the plan view, the suspended floor will be supported by a 270 mm wide double-brick cavity wall (loadbearing) at all the sides and edges. Assume that the suspended floor will be supported on both leaves of the cavity walls (which include door openings not shown).  An additional internal support is a universal beam, which will be supported on two reinforced concrete columns. Provide a report to describe the design and construction information of this suspended floor slab.  Your report should answer the following questions.

Question 1

Explain whether the slab is one-way or two-way span.

Question 2

Provide a deflection diagram of this slab under loading, indicating tension and compression fibres.  There is no necessary need to use a scale ruler or know the exact amount of deflection. This is to be a rough sketch only.

Question 3

Draw the Cross-Section of X – X using a suitable scale ruler to facilitate the construction process.  No need to provide a Detailed Drawing of the slab to wall junction in this question. Pay critical attention to the slab itself, including reinforcement.

Question 4

Provide an annotated sketch to show the slab to wall connection (no scale required).

Question 5

To satisfy the BCA (‘Building Code of Australia’) recommendations for sound insulation, assume that this floor will need to achieve the following:

Rw (Sound Reduction Index) = 50

IIC (Impact Insulation Class) = 50

Using the available information, find whether this design is satisfactory to achieve the above requisites.  If not, suggest solutions to achieve these requisites.

Question 6

Considering fast construction and fewer supports required during construction, the owner believes that composite concrete with steel formwork may be a better solution for this slab.  Despite having this belief, the owner is unsure whether this alternative would increase slab thickness. Assuming a live load of 4kPa, evaluate the indicative thickness of composite concrete with steel formwork construction using Data Sheet 1 (see attached).  This would serve to assist the owner with decision-making.

University: Curtin

This CME101: Low Rise Construction Assessment has been solved by our Civil Engineer experts at TVAssignmentHelp. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style. Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

How to create Testimonial Carousel using Bootstrap5

Clients' Reviews about Our Services