Need Help with this Question or something similar to this? We got you! Just fill out the order form (follow the link below), and your paper will be assigned to an expert to help you ASAP.
Question Description
Please chose option #1 or #2 to complete in the following weeks. Once assigned as a tutor I will give detailed instructions on both accessing the LAB.
This is a private invite
Module 1: Portfolio Milestone
Points25
Submittinga file upload
Portfolio Milestone (25 points)
Project Management Simulation
Read the description of the two simulation options in the Module 8folder. Now is the time to select the option you prefer to complete foryour final Portfolio Project. Do not do both assignments.
Option #1: Scope, Resources, Schedule #1
Week 4: Complete Scenario A
Week 6: Complete Scenario B
Week 8: Complete Scenario D
Option #2: Scope, Resources, Schedule #2
Week 4: Complete Scenario A
Week 6: Complete Scenario C
Week 8: Complete Scenario E
To make your decision, go to the Project Management Simulation: Scope, Resources, Schedule V2 (Links to an external site.) at Harvard Business Publishingonline. Once you have signed on and registered, you will be able toview the “Prepare” section to read about the project management processat Delphi Printers and learn how to perform the simulation.
Please upload a word document or a proper note in the submission areato identify the option you have selected so that you can be set up toaccess the scenario-specific information for the option you selected.
The following is only for reference and NOT to be completed now:
Module 8: Portfolio Project
Points125
Submittinga file upload
Portfolio Project (125 points)
Important! Read First
Choose one of the following two assignments to complete this week. Donot do both assignments. Identify your assignment choice in the titleof your submission.
Option #1: Project Management Simulation #1
Use the simulation tool, Project Management Simulation: Scope, Resources, Schedule V2 (Links to an external site.) (Product #: 4700-HTM-ENG), to complete this assignment.
For Option #1, complete the following:
Week 4: Complete Scenario A
Week 6: Complete Scenario B
Week 8: Complete Scenario D
Part 1: Simulation
Your Role. Senior Project Manager at Delphi Printers & Peripherals, a small electronics and computer peripheral manufacturer.
Your Task. You assemble and direct a product designteam to develop a new and innovative consumer printer. Delphi hasintelligence suggesting that a competitor is launching a printer withsimilar features and capabilities in six months, putting pressure on youand your team to develop a new printer that can compete effectivelyagainst the competitor’s offering.
You will benefit from playing the simulation multiple times usingdifferent scenarios to experience various project challenges. Thescenarios you can work on include:
Scenario A Easily achievable targets, with even weighting between objectives.
Scenario B Project has staffing crisis mid-project. Project will lose up to 3 staff members and be unable to hire for 2 weeks.
Scenario C Competitor issues surprise announcement mid-project. Schedule target will move up and points for schedule will increase.
Scenario D Very difficult management targets, with points weighted towards schedule compliance.
Scenario E Very difficult management targets. with points weighted towards scope compliance.
Simulation Goals. Successful completion of the project. Success is rated on the following metrics:
Scope
Schedule
Resources (cost)
Team process (morale and stress).
Simulation Timeline. The simulation will continue until you either complete the project successfully or decide to end it prematurely.
During Weeks 4, 6, and 8, perform the simulation multiple times andtry changing input parameters to obtain a better score and complete thescenario with better results. In doing so, you will benefit from runningthe sessions using different options and trying different action itemsto experience various project challenges. After completing thesimulation session, save a screen shot of the confirmation page showingyour total score.
Part 2: Written Assignment
Write a two- to three-page paper describing the scenario youcompleted this week, the intent of the simulation, and your lessonslearned. Identify a minimum of four what-if assessments that resulted inobtaining a better score and completing the scenario with betterresults. Use scholarly resources to support your findings.
Be sure to organize your writing properly and include the following:
Cover page
Introduction
Body of your work with headings and subheadings
Analysis and recommendations
Conclusion
List of references
Appendix A – Screen shot of confirmation page showing your best simulation score.
Consult the Sample Paper template (Links to an external site.) for more information on how to organize the paper.
Support your assignment with a minimum of three scholarly references.The CSU-Global library is a good place to locate these sources. Thewritten section should follow the CSU-Global Guide to Writing and APA (Links to an external site.).
Option #2: Project Management Simulation #2
Use the simulation tool, Project Management Simulation: Scope, Resources, Schedule V2 (Links to an external site.) (Product #: 4700-HTM-ENG), to complete this assignment.
For Option #2, complete the following:
Week 4: Complete Scenario A
Week 6: Complete Scenario C
Week 8: Complete Scenario E
Part 1: Simulation
Your Role. Senior Project Manager at Delphi Printers & Peripherals, a small electronics and computer peripheral manufacturer.
Your Task. You assemble and direct a product designteam to develop a new and innovative consumer printer. Delphi hasintelligence suggesting that a competitor is launching a printer withsimilar features and capabilities in 6 months, putting pressure on youand your team to develop a new printer that can compete effectivelyagainst the competitor’s offering.
You will benefit from playing the simulation multiple times usingdifferent scenarios to experience various project challenges. Thescenarios you can work on include:
Scenario A Easily achievable targets, with even weighting between objectives.
Scenario B Project has staffing crisis mid-project. Project will lose up to 3 staff members and be unable to hire for 2 weeks.
Scenario C Competitor issues surprise announcement mid-project. Schedule target will move up and points for schedule will increase.
Scenario D Very difficult management targets, with points weighted towards schedule compliance.
Scenario E Very difficult management targets. with points weighted towards scope compliance.
Simulation Goals. Successful completion of the project. Success is rated on the following metrics:
Scope
Schedule
Resources (cost)
Team process (morale and stress)
Simulation Timeline. The simulation will continue until you either complete the project successfully or decide to end it prematurely.
During Weeks 4, 6, and 8, perform the simulation multiple times andtry changing input parameters to obtain a better score and complete thescenario with better results. In doing so, you will benefit from runningthe sessions using different options and trying different action itemsto experience various project challenges. After completing thesimulation session, save a screen shot of the confirmation page showingyour total score.
Part 2: Written Assignment
Write a two- to three-page paper describing the scenario youcompleted this week, the intent of the simulation, and your lessonslearned. Identify a minimum of four what-if assessments that resulted inobtaining a better score and completing the scenario with betterresults. Use scholarly resources to support your findings.
Be sure to organize your writing properly and include the following:
Cover page
Introduction
Body of your work with headings and subheadings
Analysis and recommendations
Conclusion
List of references
Appendix A – Screen shot of confirmation page showing your best simulation score.
Consult the Sample Paper template (Links to an external site.) for more information on how to organize the paper.