Question Description

Discussion1: discussion 250words and 2 replies general replies for the discussion

List three methods for deriving duration estimates for project activities. What are the strengths and weaknesses associated with each method?

Discussion2: discussion 250words and 2 replies general replies for the discussion

The advantage of Gantt charts lies in their linkage to the project schedule baseline. Explain this concept.

Case study:

Assignment 5.1 Case Study 10.1 Project Scheduling at Blanque Cheque Construction (A), Page

Questions

Develop a project network consisting of at least 20 steps that should be done to complete the project. As the case suggests, keep the level of detail for these activities general, rather than specific. Be sure to indicate some degree of precedence relationship among the activities.
Suppose you now wanted to calculate duration estimates for these activities. How would you make use of the following approaches? Are some more useful than others?
Expert opinion
Past history
Mathematical derivation

Writing Requirements

3–5 pages in length (excluding cover page, abstract, and reference list)
APA format, Use the APA template located in the Student Resource Center to complete the assignment.
Please use the Case Study Guide as a reference point for writing your case study.